The waterfront will be undergoing a significant renovation this summer with construction starting in June. The Town of Wasaga Beach posted details of initial reconstruction plans on its website.
It will be exciting to see the beach get re-developed in the coming years. It is badly in need of a facelift. Construction is starting this summer with the demolition of buildings between 1st and 3rd street. Beach drive will be elevated and converted into a pedestrian mall.
A concept of the re-development plan for Beach area 1 is shown below.